Our Projects
Verified Track Record

Our Projects

Delivering excellence across Africa. Explore our portfolio of verified construction, civil infrastructure, renewable energy, and smart technology projects.

▼
▼
Showing 6 of 6 projects
Kilimani Commercial Centre
Completed
Buildings & Construction2025

Kilimani Commercial Centre

A 9-storey modern commercial office complex featuring open-plan offices, basement parking, energy-efficient curtain walls, and rooftop amenities.

Nairobi, KenyaCase Study →
Regional Highway & Drainage Corridor
Ongoing
Roads & Civil Infrastructure2026

Regional Highway & Drainage Corridor

Construction and rehabilitation of 28km of heavy-duty bitumen standard road including pre-cast drainage culverts, gabions, and pedestrian walkways.

Rift Valley, KenyaCase Study →
Agro-Industrial 1.2MW Solar & Storage Hub
Completed
Energy & Renewable Solutions2025

Agro-Industrial 1.2MW Solar & Storage Hub

Turnkey rooftop and ground solar installation coupled with 2.4MWh battery energy storage for 24-hour cold storage and packaging operations.

Naivasha, KenyaCase Study →
Eastern Catchment Water Dam & Distribution
Completed
Water Resources & Earthworks2024

Eastern Catchment Water Dam & Distribution

Constructed an engineered 120,000 cubic meter earth dam with clay-core cutoff trench, spillway, and 12km gravity water pipeline to 6 villages.

Kitui, KenyaCase Study →
Smart Logistics Hub Building Management & Security
Completed
Electrical, Electronics & Smart Tech2025

Smart Logistics Hub Building Management & Security

Integrated building automation, fiber network, smart electrical distribution, and AI-powered CCTV surveillance for a 40,000 sq ft logistics center.

Mombasa Corridor, KenyaCase Study →
Urban EV Charging Station & Geodetic Setting-Out
Ongoing
Engineering, Surveying & E-Mobility2026

Urban EV Charging Station & Geodetic Setting-Out

High-precision topographic layout and deployment of an 8-bay dual 120kW DC Fast Charging hub for commercial fleets and private electric vehicles.

Westlands, Nairobi, KenyaCase Study →